A GO train leaving Union Station in Toronto roars past the elevator block rising for the first tower of Ivanhoé Cambridge’s 2.9-million-square-foot CIBC Square. The tower, one of many in the works in downtown Toronto, is slated to open in mid-2020 and is already fully leased.

A GO train leaving Union Station in Toronto roars past the elevator block rising for the first tower of Ivanhoé Cambridge’s 2.9-million-square-foot CIBC Square. The tower, one of many in the works in downtown Toronto, is slated to open in mid-2020 and is already fully leased.

Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.
Required field.
Invalid email format.
Some of the fields are not filled or invalid.
Form Template
Select a Form Template
Available fields in the selected template:
Marketing Landing Page URL
To change the postfix value, please go to the theme options into the Developments section.
Downloads Page URL
To change the postfix value, please go to the theme options into the Developments section.